DM Integration / DMi Articles  / Vendor Scheduling
DMi Article
1:55 pm 1:55 pm

Vendor Scheduling

Vendor Scheduling
“Is Vendor Scheduling in horse racing form terms SFSF”
(Started, Farted, Slipped and Fell)?

 

 

The concept of Vendor Scheduling was developed alongside MRPII (ERP) principals and Lean/JIT thinking back in the 1980’s/90’s. The basic premise is to provide the Vendor/Supplier with stable and reasonable long term visibility for them to use within their planning process. The benefits of this approach are win-win on both sides.

Read more – download the full article.

Share